AI-Based Dynamic Resource Allocation in Construction Projects: A Reinforcement Learning Approach to Time–Cost–Resource Optimization
Keywords:
artificial intelligence, reinforcement learning, Proximal Policy Optimization, construction project management, resource allocation, time–cost optimization, project schedulingAbstract
This study aimed to develop and evaluate an artificial intelligence–based dynamic resource-allocation framework using reinforcement learning to simultaneously optimize project duration, cost performance, and resource utilization in construction projects. A quantitative computational study was conducted using data from 84 medium- and large-scale construction projects in Tehran, Iran, together with validation input from 168 construction professionals. Project-level data included activity schedules, labor and equipment allocation, progress, costs, resource conflicts, idle time, and operational constraints. A Proximal Policy Optimization reinforcement learning model was developed to dynamically allocate resources at weekly decision intervals. The model state incorporated schedule, cost, activity, and resource indicators, while the reward function jointly represented time, cost, and resource-efficiency objectives. Projects were divided at the project level into training, validation, and independent test subsets. Model performance was compared with historical managerial allocation and a conventional rule-based scheduling strategy. Robustness, sensitivity, and expert-validation analyses were also conducted. PPO-based allocation significantly reduced project completion time compared with historical allocation (mean difference = -2.68 months, 95% CI [-3.26, -2.10], p < .001, d = 1.02) and rule-based allocation (-1.13 months, 95% CI [-1.48, -0.78], p < .001, d = 0.71). Schedule deviation was significantly reduced by 7.69 percentage points relative to historical allocation (p < .001, d = 1.56) and by 3.25 percentage points relative to rule-based allocation (p < .001, d = 0.98). Cost deviation decreased by 5.83 and 2.42 percentage points, respectively (both p < .001). Labor utilization significantly increased by 12.94 percentage points versus historical allocation (p < .001, d = 1.91) and 6.22 percentage points versus rule-based allocation (p < .001, d = 1.28), while equipment utilization also improved significantly. Resource conflicts were significantly lower under PPO than both comparison strategies (both p < .001). Reinforcement learning provided a feasible, robust, and statistically superior approach to dynamic construction resource allocation, enabling simultaneous improvements in schedule performance, cost control, and resource utilization.
References
Bahroun, Z., Tanash, M., As’ad, R., & Alnajar, M. (2023). Artificial Intelligence Applications in Project Scheduling: A Systematic Review, Bibliometric Analysis, and Prospects for Future Research. Management Systems in Production Engineering, 31(2), 144-161. https://doi.org/10.2478/mspe-2023-0017
Chen, X., & Chen, L. (2024). Exploration of Adaptive Environment Design Strategy Based on Reinforcement Learning in CAD Environment. Computer-Aided Design and Applications, 175-190. https://doi.org/10.14733/cadaps.2024.s23.175-190
Dai, W., Zan, J., Zhang, P., Hu, D., Fang, R., & Dong, Y. (2026). Cell-Free UAV Real-Time Sensing for Enhanced Substation Operation: Network Construction and Resource Management. Journal of Physics Conference Series, 3212(1), 012006. https://doi.org/10.1088/1742-6596/3212/1/012006
Fawzy, M., Elshaer, R., Chuddher, B. A., & Algohary, G. (2026). Solving the Multi-Skill Resource-Constrained Project Scheduling Problem Considering Skill Depth and Breadth Using ACO Algorithm and LINGO. Algorithms, 19(9), 738. https://doi.org/10.3390/a19090738
Gao, Z., Liu, S., Shi, G., Sun, Y., Ge, X., & Wang, Y. (2026). A Collaborative Scheduling Approach for Sheet Metal Workshops in Printing Equipment Ovens Based on Graph Attention Reinforcement Learning. Symmetry, 18(8), 1298. https://doi.org/10.3390/sym18081298
Guo, R. (2024). Research and Application of Deep Learning Technology in Prefabricated Buildings. Journal of World Architecture, 8(2), 134-139. https://doi.org/10.26689/jwa.v8i2.6920
Huang, Q., & Bai, Y. (2023). Application of Improved Artificial Immune System Algorithm Based on Applied Mathematics for Optimization of Manpower Allocation in Construction Engineering. Processes, 11(7), 1870. https://doi.org/10.3390/pr11071870
Khan, I. U., Saleem, M. A., & Hussain, F. (2024). A Comparative Analysis of Different Vehicular Fog Computing Scheduling Algorithms. Journal of Independent Studies and Research - Computing, 22(1). https://doi.org/10.31645/jisrc.24.22.1.9
Li, B., Yang, C., & Yang, Z. (2023). Multiple Container Terminal Berth Allocation and Joint Operation Based on Dueling Double Deep Q-Network. Journal of Marine Science and Engineering, 11(12), 2240. https://doi.org/10.3390/jmse11122240
Li, B., & Zhang, Z. (2026). A Multiagent Reinforcement Learning–based Approach for Construction Resource Scheduling and Cost Control in Intelligent Construction Sites. 39. https://doi.org/10.1117/12.3118711
Li, Y., Niu, X., Li, P., H, L., Dong, R., Li, N., & Tan, Z. (2026). Multi-Agent Deep Reinforcement Learning for Dynamic Cost Overrun Mitigation in Smart Grid Construction Projects. Energies, 19(13), 3147. https://doi.org/10.3390/en19133147
Liang, H., Yang, Z., Zhang, G., & Hou, H. (2024). Resource Allocation for Space-Air-Ground Integrated Networks: A Comprehensive Review. Journal of Communications and Information Networks, 9(1), 1-23. https://doi.org/10.23919/jcin.2024.10494938
Liu, H., Zhou, H., Chen, H., Yan, Y., Huang, J., Xiong, A., Yang, S., Chen, J., & Guo, S. (2023). A Federated Learning Multi-Task Scheduling Mechanism Based on Trusted Computing Sandbox. Sensors, 23(4), 2093. https://doi.org/10.3390/s23042093
Lou, H. P., Shen, X., & Xu, J. (2025). Multi-Team Agile Software Project Scheduling Using Dual-Indicator Group Learning Particle Swarm Optimization. Symmetry, 17(8), 1267. https://doi.org/10.3390/sym17081267
Luo, J. (2025). MADRL-Based Intelligent Resource Allocation for Green Sports Events. International Journal of Decision Support System Technology, 17(1), 1-23. https://doi.org/10.4018/ijdsst.393787
Mirjalili, R. (2025). Resource-Based Time and Cost Prediction in Project Networks: From Statistical Modeling to Graph Neural Networks. https://doi.org/10.48550/arxiv.2511.15003
Olaya, S., Tibaná, C., Sánchez, O., Castañeda, K., & Torres, K. (2026). Human Resource Planning for Building Construction Processes Through the Integration of BIM and Line of Balance. Buildings, 16(10), 1919. https://doi.org/10.3390/buildings16101919
Sun, Y. (2025). A Complex Project Management Method Optimized by Ant Colony Algorithm. Engineering Research Express, 7(4), 045293. https://doi.org/10.1088/2631-8695/ae1ddd
Verma, P., Maurya, A. K., & Yadav, R. S. (2023). A Survey on Energy‐efficient Workflow Scheduling Algorithms in Cloud Computing. Software Practice and Experience, 54(5), 637-682. https://doi.org/10.1002/spe.3292
Wang, L., Liu, H., Xia, M., Wang, Y., & Li, M. (2023). Research on a Multilevel Scheduling Model for Multi Variety and Variable Batch Production Environments Based on Machine Learning. Frontiers in Energy Research, 11. https://doi.org/10.3389/fenrg.2023.1251335
Wang, L., Zhao, Y., & Yin, X. (2023). Precast Production Scheduling in Off-Site Construction: Mainstream Contents and Optimization Perspective. Journal of Cleaner Production, 405, 137054. https://doi.org/10.1016/j.jclepro.2023.137054
Wang, M., Guo, H., Liu, C., Shabaz, M., Aldawsari, H., & Qiao, S. (2026). A Hierarchical and Entropy‐Adaptive Reinforcement Learning Framework for Multi‐Task Offloading in Vehicular Ad Hoc Networks. Transactions on Emerging Telecommunications Technologies, 37(6). https://doi.org/10.1002/ett.70454
Xu, G., & Guo, T. (2025). Advances in AI-powered Civil Engineering Throughout the Entire Lifecycle. Advances in Structural Engineering, 28(9), 1515-1541. https://doi.org/10.1177/13694332241307721
Yang, J., & Wu, Y. (2023). Dynamic Resource Allocation Strategy of Multi-Objective Fuzzy Optimization Based on Markov Decision Process. IEEE Access, 11, 99607-99613. https://doi.org/10.1109/access.2023.3314657
Yang, T. (2026). Intelligent Scheduling and Optimization Decision Model of Elderly Service Resources Based on Reinforcement Learning. 25. https://doi.org/10.1117/12.3108077
Yao, Y. (2026). Deep Learning‐Based Intelligent Resource Management for Renewable Energy Engineering Projects. Annals of the New York Academy of Sciences, 1563(1). https://doi.org/10.1111/nyas.70353
Zeng, J., Cheng, Y., Lu, C., Wang, Z., Liu, X., Wang, X., & Song, D. (2026). A Hybrid Reverse Learning Particle Swarm Optimization Method for Aircraft Maintenance Scheduling Based on the Resource-Constrained Project Scheduling Problem Model. Machines, 14(6), 622. https://doi.org/10.3390/machines14060622
Zhang, J., Wang, T., & Cheng, L. (2023). Time-Sensitive and Resource-Aware Concurrent Workflow Scheduling for Edge Computing Platforms Based on Deep Reinforcement Learning. Applied Sciences, 13(19), 10689. https://doi.org/10.3390/app131910689
Zhang, L., Fang, M., Yuan, K., Cheng, S., & Bai, L. (2025). Bridging Project Management and Supply Chain Management via Optimization Method: Scenarios, Technologies, and Future Opportunities. Mathematics, 13(21), 3490. https://doi.org/10.3390/math13213490
Zhang, N., Yang, G., Su, B., & Song, W. (2024). Transfer Learning Method From Parameter Scene to Physical Scene Based on Self-Game Theory. Electronics, 13(7), 1327. https://doi.org/10.3390/electronics13071327
Zhang, Y. (2025). Development of an Integrated Intelligent BIM-based Model for Multi-Objective Optimization in Engineering Assembly Processes. PLoS One, 20(11), e0333354. https://doi.org/10.1371/journal.pone.0333354
Zhasmukhambetova, A., Evdorides, H., & Davies, R. J. (2025). Integrating Risk Assessment and Scheduling in Highway Construction: A Systematic Review of Techniques, Challenges, and Hybrid Methodologies. Future Transportation, 5(3), 85. https://doi.org/10.3390/futuretransp5030085
Zhou, X., Liang, W., Yan, K., Li, W., Wang, K. I., Ma, J., & Jin, Q. (2023). Edge-Enabled Two-Stage Scheduling Based on Deep Reinforcement Learning for Internet of Everything. Ieee Internet of Things Journal, 10(4), 3295-3304. https://doi.org/10.1109/jiot.2022.3179231
Downloads
Publication Timeline
- Submitted
- Revised
- Accepted
Issue
Section
License
Copyright (c) 2026 Mohammad Elahi

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.