[1]
M. Moradi, “Optimization of the Time-Cost-Quality Trade-Off in the Context of the Haftkel Dam Construction Project”, JRMDE, vol. 3, no. 3, pp. 135–145, Sep. 2024, Accessed: Aug. 04, 2025. [Online]. Available: https://journalrmde.com/index.php/jrmde/article/view/96