(1)
Moradi, M.; Abbasi Dezfouli, A. Optimization of the Time-Cost-Quality Trade-Off in the Context of the Haftkel Dam Construction Project. JRMDE 2024, 3 (3), 135-145. https://doi.org/10.61838/kman.jrmde.96.